Rate analysis of brickwork now requires rates of various materials like cement, sand, bricks, and rates for labour i.e. mason and other labours. the rates of these varies with location and time. these may be obtained from the schedule of rates of particular location or can be taken from local market and shall be multiplied with the quantities. Concrete, brickwork, plaster etc. rate analysis of various type of projects like, buildings, roads, bridges, tunnels, railways can be prepared. estimates and cost abstracts can be prepared easily, by entering the boq quantities of the project. program will automatically work out material take off, material cost and labour cost. Specification and finishing schedule describes the materials to be used and the work to be done in respect of the houses to be erected by blue bean trading and investments (pty) ltd (hereafter referred to as the brickwork final levels, heights of plinths, depths of excavations and number of.
Chapter 2 quantity take-off the quantity “takeoff” is an important part of the cost estimate. it must be as accurate as the quantity of material in a project can be accurately determined from the drawings. smells, column necks, brickwork, etc.) + amount above gl (or – amount below gl) as shown in figure 2.5.. Try loading schedule spreadsheet use the loading spreadsheet to create loading schedules on the fly! includes an extensive database of materials (more than 300 items) selectable from easy to use pop-up menu.. P.w.(roads) directorate section : 3 schedule of rates : 2008-2009 consumption of materials consumption of materials 3.1 consumptions for plastering, brickworks, concreting etc. consumption of different materials of construction in the corresponding contract items of works shall be computed on the basis of the quantities shown in table: 3-1, subject to a variation of plus / minus five percent..